Location |
Yuba County, California, Public Safety Power Shutoff Area |
Proposed Technology |
Solar Photovoltaic (PV), Battery Energy Storage (BESS), and
Renewable Natural Gas (RNG) Gen-Sets |
Project Size |
Two (2) 3MW RNG and
3MW/12MWh BESS systems for a total of 6MW AC RNG/24MWh BESS |
Generator
Interconnection Agreement |
Expected by Q4, 2020 |
Footprint |
2 Acres |
Land Type |
Privately owned, distributed industrial |
Site Control |
Option to lease agreement has been executed |
Status of the
Permitting |
Permitting is
ongoing |
Power Purchase Agreement |
Discussions with several Load Serving Entities |
|
|